Phangan Slope Monitoring

Phangan Slope Monitoring

loading…
Station 01: tilt_5/6/7 = node 11 (11_tilt1..3) · tilt_8 = node 10 (with soil 1-3) · tilt_9 = node 12 (with soil 4-6) · tilt_1..4 x/y = 2-axis nodes 2-5.   Station 02: tilt_5 = 13_tilt1 (with soil 1-4) · tilt_6 = 13_tilt2 (with soil 5-8) · tilt_1..4 x/y = 2-axis nodes 6-9.
Data coverage: full sensor set, 1-minute resolution, 25 Jun 2026 – 19 Oct 2026 12:02 ICT. 25 Jun – 25 Aug 08:59 from the original export; 25 Aug 09:00 onward from the ThingsBoard DRR dashboard (public view). The old ‘alarm’ channel stops on 2 Sep 2026; ThingsBoard now publishes alarm1 and alarm2 (0/1 flags, meaning not yet confirmed) — both are shown here as informational tiles/series and do not change the station status.
unpacking data…